MainPage:Nuclear:NPS:Design

From cua_phy
Revision as of 11:18, 23 August 2017 by Hornt (talk | contribs) (→‎Magnet)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Frame

NPS frame design scaled from HyCal

Frame design drawing from HyCal

Magnet

Status of the main coil - update from Buckley Systems (8/22/17)

  • Coil shipment delayed until end of November 2017 due to tooling modifications needed and company mis-calculation of total amount of copper needed


Status of the corrector coil - delivered and at JLab in test lab


Status of yoke

  • earlier drawings