Difference between revisions of "MainPage:Nuclear:DVCS-3"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
::* Determine the livetime/deadtime correction factor (LTCF) | ::* Determine the livetime/deadtime correction factor (LTCF) | ||
::* Take a trigger rate/live rate and normalize using the current, adjust to the prescale, and then apply the LTCF. | ::* Take a trigger rate/live rate and normalize using the current, adjust to the prescale, and then apply the LTCF. | ||
− | ::* | + | ::* To make sure the deadtime is correctly computed, the deadtime, current and prescale factors should be in agreement more than 1%, especially for the range of rates in which the deadtime is linear. |
* Currently analyzing run taken in April 2016, 13418 which was a dedicated run for the deadtime analysis, at three different currents (10, 15, 20 uA) using a liquid hydrogen target. | * Currently analyzing run taken in April 2016, 13418 which was a dedicated run for the deadtime analysis, at three different currents (10, 15, 20 uA) using a liquid hydrogen target. | ||
+ | * There are other dedicated deadtime runs: 12471 to 12476 at a current of ~5 uA with different prescale factors ( ). | ||
==Deadtime Analysis== | ==Deadtime Analysis== |
Revision as of 10:16, 28 June 2017
⇐ Back to the Main_Page |
DVCS-3 Updates
- Deadtime analysis in progress: main goal is to be able to
- Determine the livetime/deadtime correction factor (LTCF)
- Take a trigger rate/live rate and normalize using the current, adjust to the prescale, and then apply the LTCF.
- To make sure the deadtime is correctly computed, the deadtime, current and prescale factors should be in agreement more than 1%, especially for the range of rates in which the deadtime is linear.
- Currently analyzing run taken in April 2016, 13418 which was a dedicated run for the deadtime analysis, at three different currents (10, 15, 20 uA) using a liquid hydrogen target.
- There are other dedicated deadtime runs: 12471 to 12476 at a current of ~5 uA with different prescale factors ( ).
Deadtime Analysis
Plots from run 13418: dedicated deadtime analysis run
Important ELog Updates
- Mongi's ELog update: DVCS ELOG LOGIN REQUIRED on May 1, 2017 (
- Mongi's ELog update: DVCS ELOG LOGIN REQUIRED on May 21, 2017