Difference between revisions of "General Meeting Summary 11/16/16"
Jump to navigation
Jump to search
(Created page with "DETECTOR UPDATES * NPS PMT shielding (Arthur) ::* Single crystal single counter has been assembled and tested ::* Next: ::::* trigger oscilloscope with output from pulse genera...") |
|||
Line 27: | Line 27: | ||
::* Next: | ::* Next: | ||
::::* Measurements by Salina and Rishabh | ::::* Measurements by Salina and Rishabh | ||
+ | |||
+ | |||
+ | OTHER | ||
+ | |||
+ | * CUA lab clean up Friday, 18 Nov., at 3pm | ||
+ | |||
+ | * APS April meeting registration | ||
+ | |||
+ | * JLab Hall A/C meeting registration | ||
NEXT MEETING: WED. 23 NOV at 10:00 AM (EST) | NEXT MEETING: WED. 23 NOV at 10:00 AM (EST) |
Latest revision as of 14:33, 16 November 2016
DETECTOR UPDATES
- NPS PMT shielding (Arthur)
- Single crystal single counter has been assembled and tested
- Next:
- trigger oscilloscope with output from pulse generator to "calibrate" for studies with magnetic field
- insert single counter in magnetic fields of different orientation and strength (up to 50 Gauss)
- Aerogel detector (Arthur)
- Assembly of eighth layer ongoing
- expect to be able to to tray-exchange to SP-11 before Christmas break
- Cosmic tests in hall either with full hodoscope array and Hall C DAQ system or (if that's not ready) with two channels from pre-shower as done for SP-30 and SP-15 trays
- Note on cabling of Hall C DAQ system: need to check the cable mapping for aerogel detector and also cables themsevles
- Alternative readout of PWO crystals (Andres)
- APD and pre-amplifier circuitry assembled - resulting signal appears to be noise - will require shielding
- Discussion about next steps
- Greg contacted Marco Battaglieri's group that was/is responsible for Hall B HPS cal. A full setup for crystal APD-based readout will be available to CUA after Thanksgiving
- Andres will meet with Marco's group to discuss about setup optimization
- In January 2017 we'll try to see the HPS setup at JLab
- Recent crystal light yield measurements (Richard)
- Data taken for SICCAS J19 and CRYTUR #1 - analysis is ongoing
- Next:
- Measurements by Salina and Rishabh
OTHER
- CUA lab clean up Friday, 18 Nov., at 3pm
- APS April meeting registration
- JLab Hall A/C meeting registration
NEXT MEETING: WED. 23 NOV at 10:00 AM (EST)