Difference between revisions of "MainPage:Nuclear:NPS:PWO:CrystalLOG:SICCA02"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
! "background:#f5f5f5;" style="text-align:center; background:lavender; font-weight:bold; width:10%;" | Date | ! "background:#f5f5f5;" style="text-align:center; background:lavender; font-weight:bold; width:10%;" | Date | ||
− | ! "background:#f5f5f5;" style="text-align:center; background:lavender; font-weight:bold; width: | + | ! "background:#f5f5f5;" style="text-align:center; background:lavender; font-weight:bold; width:15%;" | Description |
− | ! "background:#f5f5f5;" style="text-align:center; background:lavender; font-weight:bold; width: | + | ! "background:#f5f5f5;" style="text-align:center; background:lavender; font-weight:bold; width:75%;" | Comments |
|- | |- | ||
| 12/09/2015 || unwrapped || Unwrapped as arrived at CUA. Cracks observed on the face. | | 12/09/2015 || unwrapped || Unwrapped as arrived at CUA. Cracks observed on the face. |
Revision as of 22:14, 14 December 2015
⇐ Back to Neutral Particle Spectrometer |
⇐ Back to the Main_Page |
Time LOG
Date | Description | Comments |
---|---|---|
12/09/2015 | unwrapped | Unwrapped as arrived at CUA. Cracks observed on the face. |
12/10/2015 | Thermal annealing | Starting 10:30AM. Ramp up at 18oC/hour until 200oC, stay at 200oC for 10 hours, ramp down at -18oC/hour. |
12/14/2015 | Wrapped | Preparing for light yield measurement. Approximately 5 layers of teflon tape, and 2 layers of black tape. |
12/14/2015 | LY scan | Measurement of LY along crystal. Cracked area far apart from PMT; cracked face opposite to the radioactive side. More details in the LOGBOOK, runs 2932.. |