Line 15: | Line 15: | ||
== Material orders == | == Material orders == | ||
− | The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October | + | The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October 13! |
{| border="0" halign="center" | {| border="0" halign="center" |
Revision as of 09:49, 17 October 2011
This page is under construction. It requires a review! |
⇐ Back to the Kaon Detector page |
Drawings
Links to drawings files.
Material orders
The materials had been ordered by Dr. Marek. Almost all the structural pieces (aluminum pieces) was delivered on October 10th, at CUA. Paul started milling the first piece of our new detector on October 13!